2016 Stormwater Facility Inspections

  • Inspections Due

    All ponds with agreements from 2006 are required to have their inspections in 2016. These reports are due by August 15, 2016.  
  •     
  • Harmony Hills II Subdivision: 4 wet ponds and 1 dry
  • Lilly Creek Highlands IV Subdivision: 3 wet ponds and 1 dry pond 
  • Little League Expansion: 5 dry ponds with filter material
  • Pizzeria Uno on Premier Lane: 1 dry pond with filter material
  • Reich Tool & Design/AJ Die-Namics: 1 wet pond and 1 dry pond
  • Spencer’s Pass East Subdivision: 1 wet pond
  • Super Excavators: 1 underground system
  • Wildwood Lake: 1 wet pond

 

All ponds with permits from 2011 are required to have their inspections in 2016. These reports are due by August 15, 2016.
  

 

Biannual Inspections due May 15 and November 15, 2016 
          2015 Permit
          Pilgrim Spring Market Place: Porous Pavement
   May Report

 

Village Inspections on Stormwater Facilities are due:
 

 As-Builts Submitted
 2016 As-builts 
          Christman Estates 

          2015-04 permit and map     2016 As-built Report 2016 as-built map

ER Wagner

2016-05 Permit and map      2016 As-built Report   2016 Asbuilt Map

Keystone Riverview Condos

2016-01 Permit and map      2016 As-built Report

Riverwalk on the Falls

2016-02 Permit and map      2016 As-built Report 

Fox Meadows

2016-03 Permit and map      2016 As-built Report

          Home2 Suites

2016-07 Permit and map      2016 As-built Report 

Zilber Parking Lot Lilly Road

2016-08 Permit and map      2016 As-built Report and  map

Fairchild Equipment

          2016-09 Permit and map      2016 As-built Report and  map 

Shady Lane School

2016-10 Permit and map      2016 As-built Report